Decisions before costs and assembly proposal
Having enough ports does not automatically mean enough PoE power. When connecting between buildings, the entire route must be assessed, including construction and surroundings. We assess photos, equipment and connections before the proposal is made. The choice must suit this situation: The front door, rear and driveway each require a different coverage. The proposal makes clear which activities and materials are included.

