Expand installation at a company hall
Discuss production, fabric, vibrations, and accessibility before execution. A suitable workspace and a time when machines are not in the way can determine the planning. Record which zones can be tested separately without interrupting the entire process. For expand installation, we first discuss cable distances, network capacity and scalable storage with entrepreneur and facility management. We first check the capacity, compatibility and free connections of the current system. A free connection point does not prove that the recorder still has capacity for the desired additional camera stream. We also consider how maintenance should be able to occur without stopping production.

