Decisions before costs and assembly proposal
Having enough ports does not automatically mean enough PoE power. When connecting between buildings, the entire route must be assessed, including construction and surroundings. We assess photos, equipment and connections before the proposal is made. The choice must suit this situation: High stands, charging docks and large contrasts make standard coverage unreliable. The proposal makes clear which activities and materials are included.

