New installation at a company hall
Discuss production, fabric, vibrations, and accessibility before execution. A suitable workspace and a time when machines are not in the way can determine the planning. Record which zones can be tested separately without interrupting the entire process. For new installation, we first discuss cable distances, network capacity and scalable storage with entrepreneur and facility management. We start with the situation and then only choose equipment and mounting points. A coupling is only useful when the camera actually sees the area of the relevant detector. We also consider how maintenance should be able to occur without stopping production.

