The technical starting position
A camera at the end of a long route can capture images during the day and may fail during night shifts or bad weather. The total route is then more relevant than a single separate length.
A longer PoE route can work well, but every intermediate connection, cable quality and peak load counts.

A camera at the end of a long route can capture images during the day and may fail during night shifts or bad weather. The total route is then more relevant than a single separate length.
Draw the track including connection points, cable type, any couplings and switch or injector. Note when the malfunction occurs and which functions are then active.
Repair poor connections, choose a suitable intermediate solution or adjust the design on the route. Do not add extra equipment blindly without knowing which part is bounded.
Test image, recording and power supply under the relevant load. Document the process and test result so that later expansion does not rest on assumptions.
No. Quality, preparation and power supply affect the result.
Extra features may give a different load; research on power supply and trajectory.