Expand existing system at a company hall
Discuss production, fabric, vibrations, and accessibility before execution. A suitable workspace and a time when machines are not in the way can determine the planning. Record which zones can be tested separately without interrupting the entire process. For expand existing system, we first discuss cable distances, network capacity and scalable storage with entrepreneur and facility management. Model series, recorder capacity, power supply and firmware determine what can be added without replacement. In mixed analog and IP systems, the recorder determines which modernization is possible without breaking down. We also consider how maintenance should be able to occur without stopping production.

