Replace existing installation at a company hall
Discuss production, fabric, vibrations, and accessibility before execution. A suitable workspace and a time when machines are not in the way can determine the planning. Record which zones can be tested separately without interrupting the entire process. For replace existing installation, we first discuss cable distances, network capacity and scalable storage with entrepreneur and facility management. We determine which parts are still usable and where replacement is really needed. Mounting too high provides a view but costs recognition; we make that decision consciously per position. We also consider how maintenance should be able to occur without stopping production.

